{"version":"2.1.307","anchor":"overage-limitscope-omitted-when-organization","canonical_anchor":"overage-limitscope-omitted-when-organization","heading":"Organisation-wide overage reports no longer include a limit scope","tier":"internal","area":"Usage & Limits","scope":"org","heads_up":false,"url":"https:\/\/changelogs.core-directive.com\/v\/2.1.307\/e\/overage-limitscope-omitted-when-organization","release_url":"https:\/\/changelogs.core-directive.com\/v\/2.1.307","markdown":"### Organisation-wide overage reports no longer include a limit scope\n\nWhen you go over a rate limit that applies to the whole organisation, the overage report now leaves out the scope of the limit\n\n**What**\n\nWhen you go past a rate limit, which is a cap on how much you can use in a period, Claude Code reports the overage. That report used to include which scope the limit applied to whenever one was known. It now leaves the scope out when the limit applies to the whole organisation.\n\n**Why**\n\nThis changes what is reported for organisation-level overages.\n\n- Area: Usage & Limits\n- Tier: Under the hood\n- Useful: 1\/5\n- Signal: 1\/5\n- Scope: org\n- Heads-up: no"}