{"version":"2.1.263","anchor":"new-copy-strings-for-an-effort-downgrade-confirmation-dialog","canonical_anchor":"new-copy-strings-for-an-effort-downgrade-confirmation-dialog","heading":"New copy strings for an effort-downgrade confirmation dialog","tier":"soon","area":"Effort Nudge","scope":null,"heads_up":null,"url":"https:\/\/changelogs.core-directive.com\/v\/2.1.263\/e\/new-copy-strings-for-an-effort-downgrade-confirmation-dialog","release_url":"https:\/\/changelogs.core-directive.com\/v\/2.1.263","markdown":"### New copy strings for an effort-downgrade confirmation dialog\n\nNew wording was added for a dialog confirming a drop to a lower thinking-effort level, not yet fully wired.\n\nThree new UI strings were added for a dialog confirming a switch to a lower thinking-effort level: a title, an accept action, and a decline action.\n\n- Area: Effort Nudge\n- Tier: Nothing to try yet\n- Useful: 2\/5\n- Signal: 2\/5\n- Present in the build but not switched on"}